← Wordings
License & permit · California

Caltrans Encroachment Permit Performance and Payment Bonds (TR-0001 and TR-0018)

Work inside a California State highway right-of-way needs a Caltrans encroachment permit, and bonded permits use two Caltrans forms: TR-0001 for performance and TR-0018 for payment. Both run to the State of California and stay in force up to a year after the project is complete.

50% performance · 100% payment California TR-0001 / TR-0018 (10/2024) current

Wording record

Title / common namePerformance Bond of State Highway Encroachment Permittee (DOT TR-0001) and Payment Bond of State Highway Encroachment Permittee (DOT TR-0018), the California Department of Transportation (Caltrans) bonds filed with an encroachment permit
The two forms share the same printed conditions; the title, form number and the description entered on the notarial certificate (“PERFORMANCE BOND” or “PAYMENT BOND”) distinguish them.
Bond typeLicense & permit: right-of-way encroachment permit bonds (performance and payment)
Industry / license categoryConstruction / work in the State highway right-of-way
JurisdictionUnited States → California → Caltrans district encroachment permit offices → Streets and Highways Code section 677
The forms recite that the principal is applying for a permit under Article 2 of Chapter 3 of Division 1 of the Streets and Highways Code to “place, change or renew an encroachment in, under or over any portion of a state highway”, and that section 677 requires a bond payable to the State.
ObligeeState of California
Both forms bind the principal and surety “to the STATE OF CALIFORNIA, as OBLIGEE”. The Encroachment Permits Manual says the bonds on privately funded work “shall name only the State as obligee”.
Typical penal sumPerformance bond at least 50% and payment bond 100% of the estimated cost of work inside the State highway right-of-way
Encroachment Permits Manual section 203.4 (Rev. 09/2023) ties the amounts to Caltrans Standard Specifications section 3-1.05. Public works encroachments costing $5,000 or more should be bonded; other encroachments are bonded at the District Permit Engineer’s discretion. Performance bonds for privately funded traffic signal or highway structure work are at least $10,000 and are held until accurate as-built plans are furnished.
Who needs itDevelopers, contractors and other permittees doing bonded work in a California State highway right-of-way
Bonding isn’t required of a local public entity authorized by law to keep facilities in a State highway and isn’t normally required of a public utility (Streets and Highways Code sections 678 and 679). A contractor working for a compliant local public entity can be excused if it has bonded that entity for at least 100% of the project. Districts may still require bonds after poor performance or unpaid fees.
What it coversFaithful performance of the permitted work and payment of encroachment permit fees
Condition 3: if the principal fails “to faithfully perform the work for which the encroachment permit was issued, or fail[s] to pay all encroachment permit fees”, the surety pays. Condition 4 reserves any right of action to the State of California alone. Caltrans’ HQ Division of Accounting looks to the bonding company before sending past-due permit fees to collection.
Surety requirementsA surety company qualified and licensed to do business in California
Letters of credit and property bonds aren’t accepted. A cash deposit is generally accepted only for non-public-works encroachments where latent defects are unlikely, such as landscaping or driveways.
Form fieldsBond number, encroachment permit number, principal, location (district, county, route, post mile), premium amount and effective date
The surety lists the bond type and the encroachment permit number on the notarial certificate, along with the principal’s phone number. Principal and attorney-in-fact both sign, and the forms support e-signature.
Form number / editionDOT TR-0001 (REV 10/2024) and DOT TR-0018 (REV 10/2024) · fillable PDFs from the Caltrans Electronic Forms System
Revision dates are printed on the forms and match the Caltrans forms catalogue (both checked 2026-11-16). They are Adobe dynamic (XFA) forms: open them in Adobe Acrobat or Reader, because browser PDF viewers show only a “requires Adobe Reader” notice.
Effective / cancellationContinuous; in force up to one year from project completion
Condition 5 lets the surety cancel on 30 days’ written notice only if no work has started under the permit. Notices go to the issuing Caltrans district office with the permit number, county, route and post mile. Condition 6 releases the surety if the permit is cancelled or withdrawn before work begins on State property.
SourceCaltrans DOT TR-0001 Performance Bond (PDF) · DOT TR-0018 Payment Bond (PDF) (official state forms · REV 10/2024 · fillable XFA PDFs, open in Adobe Acrobat or Reader · linked, not hosted)
Also: Caltrans encroachment permit forms · Encroachment Permits Manual, chapter 200 (PDF, section 203.4) · Encroachment Permits Manual
Statuscurrent
Last verified2026-11-16
Key clause (short verbatim excerpt)

From both forms (condition 3): “if the PRINCIPAL shall fail to faithfully perform the work for which the encroachment permit was issued, or fail to pay all encroachment permit fees then the SURETY herein shall pay for the same, otherwise this obligation is null and void.”

Where it fits

The 50% and 100% split follows the contract bond rule in Caltrans’ Standard Specifications, so a permittee’s surety sees much the same structure as on a State highway contract. Compare Washington’s WSDOT 272-002B highway contract bond and the private-sector AIA A312 performance and payment bonds. The contract surety guide explains how performance and payment bonds differ.

Before you apply

Confirm with the district encroachment permits office which bonds it wants, the amount (based on Caltrans’ estimate of work in the right-of-way) and whether a highway improvement agreement already sets the bonding. Developer work often pairs these bonds with local agency security, covered in our subdivision and site-improvement bonds guide; the commercial surety primer covers permit bonds generally.

Full wording text

Open the Source links above for the official Caltrans forms. We summarize the field facts and quote one short key clause rather than reproducing the forms. Global Guarantors doesn’t host copies.