WSDOT local agency bonds: proposal, performance and payment forms for Washington city and county public work

How Washington cities and counties use WSDOT local agency proposal, performance and payment bond forms, and how they sit next to chapter 39.08 RCW, retainage and federal-aid rules.

WSDOT local agency bonds: proposal, performance and payment forms for Washington city and county public work

Published: November 18, 2026 · Last verified: November 15, 2026 (PT)

Education only / verify at source / not legal advice. This guide explains the Washington State Department of Transportation (WSDOT) local agency proposal, performance and payment bond forms, and the Washington statutes and manuals that sit around them, as those sources read on November 15, 2026 (PT). Every rule cited comes from a public source retrieved that day, listed at the end. Global Guarantors publishes industry education. We aren't a surety, broker, government agency or law firm. The bid documents, the official form the agency issues, the statute, and your own lawyer's advice control.

Start here: Surety 101: three parties, one written promise · Contract surety hub · Bid bonds and bid guarantees in the United States


When a Washington city, county or other local agency lets a public works contract, the security package is often built from forms that WSDOT publishes for local agency use. Those forms are not the same as the bonds WSDOT takes on its own state highway and building contracts. The local agency set splits performance and payment into two bonds, leaves a blank for the city or county as obligee on the 2019 contract-stage forms, and — on the older proposal bond — still names the State of Washington as obligee and still gives the bidder 20 days to sign and bond after award.

That 20-day window matters because Washington's county and second-class city bidding statutes forfeit a bid deposit after ten days. This page walks the three local agency forms, contrasts them with WSDOT's state forms, and places both against chapter 39.08 RCW (Washington's public works contractor's bond statute) and chapter 60.28 RCW (retainage). It does not survey every municipal class or small works roster path, and it does not publish premiums, ratings or company-specific figures.


The short version


What "local agency" means in WSDOT practice

WSDOT is both a contracting agency in its own right and the state office that helps cities, counties and other public agencies deliver transportation projects, including work that uses Federal Highway Administration (FHWA) funds. The manual for that second role is the Local Agency Guidelines (LAG), publication M 36-63. The current compilation on WSDOT's manuals page is M 36-63.47, September 2026. The Chapter 44 and 46 pages inside it still carry an "M 36-63.43 / December 2024" footer, so those chapters appear not to have changed since then.

A Certification Acceptance agency that advertises and awards its own federal-aid work follows Chapter 46, Local Advertising and Award Procedures. The three bond forms on this page are the local agency forms listed in LAG Chapter 44.8.

Not every city or county job is a federal-aid LAG project. A municipality may use WSDOT's local agency bond forms, or a version of them, on a locally funded contract simply because those are the templates its engineers keep on file. In that case the municipality's bidding statute, ordinance and bid package are the starting point, and chapter 39.08 RCW still applies.


The three local agency forms, and how they differ from WSDOT's own bonds

WSDOT's electronic forms index, checked on November 15, 2026, lists both the local agency set and the state set. Open the official files, not just the index dates; several dates do not match the footers, as noted under What to verify at the source.

Form Used for Obligee as printed
272-001A Local Agency Proposal Bond (PDF; footer 07/2011) Bid-stage security: that the bidder, if awarded, will sign and furnish the required contract bond "State of Washington" (no blank for the city or county)
272-002A Local Agency Performance Bond (Word template; 12/2019) Contract-stage performance, including authorized changes, usually for the total contract amount Blank for the named city or county
272-003A Local Agency Public Works Payment Bond (Word template; 12/2019) Contract-stage payment of labor, subcontractors at every tier, suppliers and certain taxes (chapters 39.08, 39.12 and 60.28 RCW) Blank for the named city or county
272-001 Proposal Bond (PDF; revised 01/2020) Bid-stage security on a WSDOT state letting: that the bidder will sign and furnish WSDOT's contract bond State of Washington
272-002B Contract Bond — Highway Construction (PDF; revised 07/2021) Combined performance and payment (plus tax payment) on a WSDOT state highway contract State of Washington
272-003 / 272-003B Contract Bond — Building Construction Combined performance and payment on a WSDOT state building contract (003B is the FHWA-funded variant), plus a written defect-liability condition State of Washington
Diagram comparing the three-form WSDOT local agency bond set with WSDOT's state proposal bond and combined contract bond
Illustrative only. Use the official forms the agency issues with the bid package.

The structural difference is the one readers most often miss. On a WSDOT state highway contract, Form 272-002B is a single combined contract bond. The local agency set takes two bonds at award: 272-002A for performance and 272-003A for payment. That split is closer to the federal Miller Act pair (SF 25 and SF 25A) than to WSDOT's own highway form. Our Miller Act and little Miller Act guide is the federal and fifty-state companion.

LAG Chapter 44.8 still lists a "272-006A Local Agency Contract — Highway Construction." The current forms index lists 272-006LP as "Local Agency Contract" (index date 03/2025). Use the contract form the agency actually issues.


The proposal bond (DOT Form 272-001A)

Form 272-001A is a one-page fillable PDF. The official file's footer reads "DOT Form 272-001A EF 07/2011," although WSDOT's forms index still listed it as 11/2004 on November 15, 2026. This section describes the PDF text.

The principal and a corporate surety "authorized to do business in the State of Washington" are "held and firmly bound unto the State of Washington in the full and penal sum of five (5) percent of the total amount of the bid proposal." There is no dollar blank; the bond scales with the bid. The form describes the work as "the following highway construction," with a blank for the description, and it incorporates the bid by reference.

If the bid is accepted and the principal "shall duly make and enter into and execute said contract and shall furnish bond as required" within twenty (20) days from and after the award, exclusive of the day of the award, the obligation is null and void; otherwise it remains in full force and effect. The condition sentence on the official PDF is awkwardly worded ("as required by the within a period of twenty (20) days"); the operative period is those 20 days. The form has no surety cancellation clause. It is signed by the principal, the surety and the surety's attorney-in-fact.

Two features of this older form do not match the 2019 contract-stage templates:

It is not WSDOT's state proposal bond, Form 272-001, which is written for WSDOT highway proposals under chapter 47.28 RCW (linked under Related reading).

Sealed bid packets on a table at a public bid opening, the stage at which a local agency proposal bond is submitted
Form 272-001A is bid-stage security. County and second-class city statutes forfeit a bid deposit after ten days; the form itself uses 20 days. Read the bid documents.

Bid-deposit statutes: 5 percent, and the 10-day and 20-day clocks

A 5 percent bid deposit is the through-line in the Washington sources reviewed for this page. The sources do not all use the same forfeiture clock.

Counties. RCW 36.32.250 provides that no bid may be considered for public work unless it is accompanied by a bid deposit "in the form of a surety bond, postal money order, cash, cashier's check, or certified check in an amount equal to five percent of the amount of the bid proposed." If the successful bidder "fails to enter into the contract and furnish the contractor's bond as required within ten days after notice of the award, exclusive of the day of notice, the amount of the bid deposit shall be forfeited to the county."

Second-class cities and towns. RCW 35.23.352 requires a bid proposal deposit "in the form of a cashier's check, postal money order, or surety bond" for "a sum of not less than five percent of the amount of the bid." If the bidder fails to enter into the contract and furnish a bond "within 10 days from the date at which he or she is notified that he or she is the successful bidder," the check or money order is forfeited, or the council or commission "shall recover the amount of the surety bond." The contract bond itself is "in accordance with RCW 39.08.030."

Standard Specifications and LAG Chapter 46. WSDOT's 2027 Standard Specifications (M 41-10) are published and, per WSDOT's General Special Provisions page, "effective for all WSDOT projects advertised on or after September 14, 2026." A local agency contract uses whatever edition its bid documents incorporate. Division 1 repeats the 5 percent deposit in Section 1-02.7. The deposit may be cash, a certified or cashier's check, or a proposal bond. The surety on a proposal bond must be registered with the Washington Insurance Commissioner and must appear on the Commissioner's current Authorized Insurance List. A proposal bond "shall not be conditioned in any way to modify the minimum 5 percent required." Section 1-03.3 gives the successful bidder 20 calendar days after the Award date to return the signed contract, insurance, a satisfactory contract bond and related documents, and allows up to 20 more calendar days; Section 1-03.5 forfeits the deposit if those documents are not returned. Special provisions can change that period, so check them.

LAG Chapter 46, for Certification Acceptance agencies advertising their own federal-aid work, adopts that same 5 percent floor and the "not conditioned" rule, citing Section 1-02.7. The invitation-to-bid example forfeits the deposit if the successful bidder fails to enter into the contract and furnish a "satisfactory performance bond within the time stated in the specifications." The award-letter examples ask for signed contract documents "within 20 calendar days after the date of award." Chapter 46 also bars disqualifying a bidder under a rule that limits surety purchases to in-state sureties, if the surety is authorized in Washington.

Form 272-001A and the LAG award-letter examples follow a 20-day pattern that matches WSDOT's own highway statute (RCW 47.28.100: "within twenty days from the award, exclusive of the day of the award," with up to 20 additional days) and Section 1-03.3. The county and second-class city statutes run ten days from notice of award. Where those sources differ, the bid documents and the statute that governs that agency have to be read together; this page does not choose between them.

Other municipal classes. First-class cities may let public works "by contract pursuant to public notice and call for competitive bids" under RCW 35.22.620, which has no bid-deposit rule of its own. Code cities may use the procedures available to any class of city, including RCW 35.23.352 and chapter 39.08 RCW (RCW 35A.40.200). Counties, first-class cities and second-class cities and towns may instead use the small works roster in RCW 39.04.151 through 39.04.154; the older RCW 39.04.155 was repealed effective July 1, 2024. RCW 39.04.152 sets the roster ceiling at $350,000 until December 31, 2026 and $530,000 from January 1, 2027. Special districts were not surveyed.

Timeline comparing the ten-day bid-deposit forfeiture clock in county and second-class city statutes with the 20-day clock on Form 272-001A and in the Standard Specifications
Illustrative only. RCW 36.32.250 and RCW 35.23.352 use ten days from notice of award; Form 272-001A and WSDOT's own rules use 20 days.

The performance bond (DOT Form 272-002A)

The current official file is a one-page Word template dated 12/2019 in both its footer and WSDOT's forms index. An older 08/2012 PDF is still on WSDOT's server but is not the index-linked version.

The template is titled "PUBLIC WORKS Performance Bond" to a named Washington agency. The recital states that the agency has awarded the principal a contract and that the principal must furnish a bond for performance of all obligations under it. The principal and surety are "jointly and severally held and firmly bound to" the named agency in a sum on a line that ends with "Total Contract Amount."

The bond becomes null and void if the principal "shall well and faithfully perform all of the Principal's obligations under the Contract" and all duly authorized modifications, additions and changes, "at the time and in the manner therein specified." Otherwise it remains in full force and effect. The surety also agrees to indemnify, defend and protect the agency against any claim of direct or indirect loss from a failure of the principal, its employees, subcontractors or lower-tier subcontractors to faithfully perform. The surety waives notice of changes, extensions of time, alterations or additions, and agrees that modifications that increase the amount to be paid the principal "shall automatically increase the obligation of the Surety on this bond and notice to Surety is not required."

The surety must be a corporation licensed to do business in Washington as a surety and "named in the current list of 'Surety Companies Acceptable in Federal Bonds' as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Dept." That is a Circular 570 requirement written in older Treasury language; the current list is published by the Bureau of the Fiscal Service, as discussed below. The bond is accepted only with a fully executed original power of attorney. The surety "agrees to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of Washington." The form may be executed in two original counterparts and has no surety cancellation clause, defect-liability period or first-year cap.


The payment bond (DOT Form 272-003A)

The current official file is also a 12/2019 Word template; an older 08/2012 PDF titled "Local Agency Payment Bond – Highway Construction" remains on WSDOT's server.

The recital tracks the performance form, except that the principal must furnish "a payment bond in accord with Title 39.08 Revised Code of Washington (RCW) and (where applicable) 60.28 RCW." The penal sum line is again "Total Contract Amount," with the same automatic increase, without notice, when the contract price goes up.

The bond becomes null and void if the principal pays "all persons in accordance with RCW Titles 60.28, 39.08, and 39.12," including "all workers, laborers, mechanics, subcontractors, lower tier subcontractors, and material suppliers, and all persons who shall supply such contractor or subcontractor with provisions and supplies for the carrying on of such work," and pays "all taxes incurred on said Contract under Title 50 and 51 RCW and all taxes imposed on the Principal under Title 82 RCW." Otherwise it remains in full force and effect. Title 39.12 RCW is Washington's prevailing-wage chapter; Titles 50, 51 and 82 RCW are unemployment insurance, industrial insurance and excise taxes. The 2019 form's express mention of lower-tier subcontractors and of Title 39.12 is a change from the 2012 PDF.

The surety also agrees to indemnify, defend and protect the agency against loss from a failure to pay those persons. The Treasury-list, Washington-license, power-of-attorney, Washington-law and two-counterpart clauses match the performance form. There is no surety cancellation clause, and no 30-day claim-notice text on the face of the form. The 30-day notice lives in the statute. Our subcontractor payment-bond claim guide walks claim mechanics in general terms; the Washington notice rules are in the claims section below.

A public-works crew seen from behind on a city street reconstruction job
Washington cities and counties take performance and payment on two separate local agency bonds, usually for the total contract amount.

Chapter 39.08 RCW: Washington's public works contractor's bond

Chapter 39.08 RCW is titled "Contractor's Bond." It is the statute the 2019 payment-bond recital points to, and Washington's Court of Appeals calls it the state's "Little Miller Act," noting that Washington courts rely on federal Miller Act cases to interpret it. Like the federal act, it requires a bond taken by the public body and conditioned on performance and on payment of labor and supplies.

Who must take a bond, and what it is conditioned on. RCW 39.08.010(1)(a) requires the state, counties, municipalities and other public bodies, when they contract for work, to require "a good and sufficient bond, with a surety company as surety." The bond is conditioned on faithful performance; payment of laborers, mechanics, subcontractors, material suppliers and suppliers of provisions; and, on projects referred to in RCW 60.28.011(1)(b) or where the bond is so conditioned, payment of taxes under Titles 50, 51 and 82 RCW. A person who furnishes services or material to a subcontractor has the same right under the bond as if it had furnished the original contractor. The provisions do not apply to money loaned or advanced (RCW 39.08.010(2)).

Amount. RCW 39.08.030(1)(a) requires the bond to be "in an amount equal to the full contract price," and to run to the state of Washington, with listed exceptions. Cities, towns, public transportation benefit areas and passenger-only ferry service districts may by general ordinance or resolution fix the amount and the obligee, "not for a less amount than 25 percent of the contract price." Water-sewer districts may designate the obligee but may not go below the full contract price. A lower percentage, if adopted, will be in the agency's ordinance or resolution and the bid documents.

Contracts of $150,000 or less. At the contractor's (or a general contractor/construction manager's) option, the public entity may, in lieu of the bond, retain 10 percent of the contract amount for 30 days after final acceptance, or until tax and labor-and-industries releases arrive and any chapter 60.28 RCW liens are settled, whichever is later (RCW 39.08.010(3)). On contracts of that size the public entity may also accept a full payment and performance bond from an individual surety (RCW 39.08.010(4)). The 2019 templates are corporate-surety forms and do not themselves describe the retain-in-lieu option.

Washington law and courts. RCW 39.08.010(5) says the surety "must agree to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of Washington." Both 2019 local agency forms include that sentence. If a county, city, town or other municipal corporation fails to take the required bond, RCW 39.08.015 makes it liable to the protected persons "to the full extent and for the full amount of all such debts so contracted by such contractor."


Retainage under chapter 60.28 RCW, and when federal-aid projects skip it

Chapter 60.28 RCW is Washington's public works retainage and labor-and-material lien chapter. The 2019 payment-bond recital invokes it "where applicable."

The general rule. RCW 60.28.011(1)(a) requires public improvement contracts to provide, and public bodies to reserve, "a contract retainage not to exceed five percent of the moneys earned by the contractor" as a trust fund for claims arising under the contract and for state taxes, increases and penalties under Titles 50, 51 and 82 RCW. People who perform labor or furnish supplies have a lien on that reserved money; the claimant's notice must be given within 45 days of completion of the contract work, in the manner provided in RCW 39.08.030 (RCW 60.28.011(2)). That 45-day retainage-lien notice is not the same clock as the 30-day payment-bond notice.

Federal transportation funds. On public improvement contracts "funded in whole or in part by federal transportation funds," RCW 60.28.011(1)(b) says the contract must rely on the chapter 39.08 contract bond for the protection and payment of claimants and of the state for those taxes, instead of the retainage reserve in (1)(a). The contract bond "must remain in full force and effect until, at a minimum, all claims filed in compliance with chapter 39.08 RCW are resolved." On a federal-aid local agency project, the payment bond, not a retainage fund, is the claimants' reserved security. Confirm in the bid documents that the agency is following (1)(b).

A bond in lieu of retainage. RCW 60.28.011(6) lets the contractor submit a bond for all or any portion of the contract retainage, in a form acceptable to the public body, from an authorized surety insurer. The public body may require a minimum A.M. Best financial strength rating, not exceeding A-. That retainage bond is a separate instrument from Forms 272-002A and 272-003A. MRSC's page on guarantees, bonds and retainage (last modified January 2, 2026) is a useful secondary overview for local staff; the statute controls.


Treasury Circular 570 on the 2019 forms, and the Insurance Commissioner list

The 2019 local agency performance and payment templates require the surety to be licensed in Washington and "named in the current list of 'Surety Companies Acceptable in Federal Bonds' as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Dept." That quoted phrase is Treasury Circular 570, written in the list's older Federal Register publication style and under an older Treasury office name. Treasury now publishes the current Circular and the certified-company list on the Bureau of the Fiscal Service website, with interim changes posted there as well. Our Treasury Circular 570 guide explains how to read an entry, what the underwriting limitation is, and how to check the current list on the day you accept a bond.

The publication reference is out of date, but "named in the current list" still means the list in force when the bond is written, not a prior-year copy.

WSDOT's Standard Specifications do not use that same test. Section 1-03.4 of the 2027 Standard Specifications requires a contract bond for the full contract amount, on a Contracting Agency-furnished form, signed by a surety that is registered with the Washington Insurance Commissioner and that appears on the Commissioner's current Authorized Insurance List. Section 1-02.7 uses the same Insurance Commissioner test for a proposal bond. A local agency package that incorporates the Standard Specifications and also attaches Forms 272-002A and 272-003A may therefore point the reader at two lists. Check both against the bid package, and confirm with the agency which test it will apply at award.

A surety on the Insurance Commissioner list is not automatically the surety the 2019 forms describe unless it is also on the current Circular 570 list.


How WSDOT's state contract bonds differ

Combined vs split. Form 272-002B, revised 07/2021, is a combined performance and payment bond running to the State of Washington on a highway construction contract. It covers approved change orders, payment of laborers, mechanics, subcontractors and material providers, and payment of taxes under Titles 50, 51 and 82 RCW. Forms 272-003 (building construction, official PDF revised 01/2020) and 272-003B (building construction, FHWA-funded project) are also combined contract bonds to the state. The local agency set is the split pair described above.

Defect language on the building forms. Form 272-003 requires the principal to indemnify the state for defects in workmanship or materials that develop or are discovered within six years after final acceptance, and it caps the surety's liability for defects "for a period of one year after the acceptance of the work" at 10 percent of the bond sum. Form 272-003B uses a one-year discovery period, with the same 10 percent first-year cap. The 2019 local agency templates contain neither clause. A local warranty or defect obligation has to come from the contract or a different form.

Proposal-bond clock. WSDOT's state proposal bond (Form 272-001, revised 01/2020) and RCW 47.28.100 align on a 20-day post-award window and the State of Washington as obligee, an alignment the local agency proposal form does not automatically have when a city or county operates under a 10-day statute.


Making a claim: the 30-day notice and the supplier notice

The 30-day notice to the public body. RCW 39.08.030(1)(a) gives laborers, mechanics, subcontractors, material suppliers and persons who supplied materials, provisions or goods a right of action on the bond in their own names, and it gives the state a right of action for the taxes described in RCW 39.08.010. Except for the state with respect to those tax claims, those persons have no right of action on the bond unless, "within 30 days from and after the completion of the contract with an acceptance of the work by the affirmative action of" the public body, they file a written notice with that body in the substance the statute sets out (claimant, amount, principal and surety, and a brief description of the work). A claimant who sues the surety may recover reasonable attorneys' fees, but not in a suit brought before 30 days after the notice was filed. "Acceptance of the work by the affirmative action" of the public body is the statutory trigger, not substantial completion or the last day on site.

An earlier notice when supplies go to a subcontractor. RCW 39.08.065 requires a person furnishing materials, supplies or provisions to a subcontractor (or to a subcontractor's agent) to deliver or mail to the contractor, not later than ten days after the date of the first delivery, a written notice that deliveries have started, naming the subcontractor or agent, and stating that the contractor and the contractor's bond will be held for payment. No suit can be maintained on the contractor or the bond for those supplies unless that notice was given. It is in addition to the 30-day notice to the public body, not a substitute for it.

Retainage has a different notice period: 45 days of completion of the contract work under RCW 60.28.011(2). These are statutory time limits described from the current text, not legal advice about any particular claim.


A checklist for bidders, agencies and sureties

General education, not legal advice. Adapt it to the bid documents and to the statute that governs the awarding agency.

Before the bid goes in

  1. Confirm whether the package uses WSDOT's local agency forms (272-001A, 272-002A, 272-003A) or WSDOT's state forms, and open the official file the agency issued, not a saved copy from a prior job.
  2. Read the obligee on the proposal bond. If Form 272-001A is used and the owner is a city or county, check how the bid documents want the obligee shown.
  3. Check the number of days after award (or after notice of award) to sign the contract and furnish the contract bonds, and whether that figure comes from the form, the Standard Specifications, a special provision, or the agency's bidding statute.
  4. Confirm the surety test the package actually uses at bid and at award: authorized in Washington only, Insurance Commissioner authorized list, Circular 570, or more than one of those.
  5. Confirm that the proposal bond is 5 percent of the bid and is not conditioned below that floor.

At award, before the contract bonds are signed

  1. Fill the agency name on 272-002A and 272-003A exactly as the contract names the owner.
  2. Set each penal sum at the total contract amount, unless a cited ordinance or resolution and the bid documents set a different, still-lawful amount.
  3. Attach an original power of attorney for the attorney-in-fact, and have the surety's local office or agent information completed.
  4. On a contract of $150,000 or less, check whether the contractor has elected the 10 percent retain-in-lieu option under RCW 39.08.010(3) instead of a bond.
  5. On a federal-aid transportation project, confirm whether retainage is being omitted under RCW 60.28.011(1)(b) and that the payment bond is being treated as the claimants' reserved security.

If you may need to claim

  1. Calendar the 30-day written notice to the public body under RCW 39.08.030, measured from completion and affirmative acceptance as the statute describes it.
  2. If you furnished materials or supplies to a subcontractor, calendar the 10-day first-delivery notice to the contractor under RCW 39.08.065.
  3. If retainage is being held, calendar the separate 45-day retainage-lien notice under RCW 60.28.011(2); do not treat it as a substitute for the bond notice.
  4. Keep the filed notice, the acceptance date and the bond wording in the claim file, and read the current statute before you sue. Attorneys' fees under RCW 39.08.030 are not allowed in an action brought before 30 days after the notice was filed.

What to verify at the source


FAQs

What is a WSDOT local agency bond? One of the bond templates WSDOT publishes for cities, counties and other local agencies: Form 272-001A at bid time, and Forms 272-002A and 272-003A at award for performance and payment. They are not the bonds WSDOT takes on its own state contracts.

Is the proposal bond always 5 percent? Form 272-001A, RCW 36.32.250, RCW 47.28.090, Standard Specifications Section 1-02.7 and LAG Chapter 46 all use 5 percent of the bid (RCW 35.23.352 says "not less than five percent"). A proposal bond must not be conditioned to reduce that floor where those rules apply.

Why does Form 272-001A name the State of Washington if a city is the owner? That is how the 07/2011 form is printed. The 2019 performance and payment forms leave a blank for the local agency. Ask the awarding agency how it wants the proposal-bond obligee shown.

Do local agency contract bonds have to come from a Circular 570 surety? The 2019 Forms 272-002A and 272-003A say yes: the surety must be on Treasury's current list of companies acceptable on federal bonds, and licensed in Washington. Form 272-001A and the Standard Specifications use different tests. Read the form in the package.

How long does a claimant have to give notice on a Washington public works payment bond? Under RCW 39.08.030, claimants other than the state for taxes must file a written notice with the public body within 30 days after completion of the contract and acceptance of the work by the public body's affirmative action. Suppliers to subcontractors also have a 10-day first-delivery notice to the contractor under RCW 39.08.065.


Sources

All retrieved or confirmed November 15, 2026 (PT) unless noted.

  1. Washington State Department of Transportation, Electronic forms index (listings and dates for 272-001, 272-001A, 272-002A, 272-002B, 272-003, 272-003A, 272-003B, 272-006LP and 272-008A). wsdot.wa.gov
  2. WSDOT, DOT Form 272-001A, Local Agency Proposal Bond (official PDF; footer "DOT Form 272-001A EF 07/2011"). wsdot.wa.gov (PDF)
  3. WSDOT, DOT Form 272-002A, Local Agency Performance Bond (official Word template, 12/2019). wsdot.wa.gov (Word)
  4. WSDOT, DOT Form 272-003A, Local Agency Public Works Payment Bond (official Word template, 12/2019). wsdot.wa.gov (Word)
  5. WSDOT, older PDFs still hosted: DOT Form 272-002A EF (footer 08/2012) and "Local Agency Payment Bond – Highway Construction," DOT Form 272-003A EF (footer 08/2012). 272-002A PDF · 272-003A PDF
  6. WSDOT, DOT Form 272-001, Proposal Bond (official PDF, revised 01/2020); DOT Form 272-002B, Contract Bond — Highway Construction (official PDF, revised 07/2021); DOT Form 272-003, Contract Bond — Building Construction (official PDF, revised 01/2020); DOT Form 272-003B, Contract Bond — Building Construction, FHWA Funded Project. 272-001 · 272-002B · 272-003 · 272-003B
  7. WSDOT, Local Agency Guidelines, M 36-63.47 (September 2026 compilation), especially Chapters 11, 44 (including 44.8 Forms) and 46 (including the 5 percent bid-deposit rule, Appendix 46.41 invitation-to-bid example, award-letter examples, and Appendix 46.45). Landing page and complete PDF. LAG manual page · M 36-63.47 complete (PDF)
  8. WSDOT, Standard Specifications for Road, Bridge, and Municipal Construction, M 41-10, 2027 edition, Division 1, Sections 1-02.7, 1-03.3, 1-03.4, 1-03.5 and 1-03.6 (publication version 2027; Division 1 PDF created August 2026). Standard Specifications page · Division 1 (PDF)
  9. RCW 39.08.010, Bond required — Conditions — Retention of contract amount in lieu of bond (current through the Justice/app.leg text retrieved November 15, 2026; last cited amendment 2017 c 75 s 1). app.leg.wa.gov
  10. RCW 39.08.015, Liability for failure to take bond. app.leg.wa.gov
  11. RCW 39.08.030, Conditions of bond — Notice of claim — Action on bond — Attorneys' fees (current text retrieved November 15, 2026; latest cited amendment 2025 c 103 s 2). app.leg.wa.gov
  12. RCW 39.08.065, Notice to contractor condition to suit on bond when supplies are furnished to subcontractor. app.leg.wa.gov
  13. RCW 36.32.250, Competitive bids — Contract procedure — Contracts under $40,000 — Small works roster process. app.leg.wa.gov
  14. RCW 35.23.352, Public works — Contracts — Bids — Small works roster — Purchasing requirements. app.leg.wa.gov
  15. RCW 47.28.090, Opening of bids and award of contract — Deposit, and RCW 47.28.100, Failure or rejection of bidder. 47.28.090 · 47.28.100
  16. RCW 60.28.011, Retained percentage — Public transportation projects — Labor and material lien created — Bond in lieu of retained funds (including (1)(a), (1)(b), (2) and (6)). app.leg.wa.gov
  17. Municipal Research and Services Center (MRSC), Guarantees, Bonds, and Retainage (last modified January 2, 2026). Secondary Washington local-government overview; statutes and official forms control. mrsc.org
  18. WSDOT, General Special Provisions (GSPs) page ("The 2027 Standard Specification Book is effective for all WSDOT projects advertised on or after September 14, 2026") and September 14, 2026 WSDOT Standard Specifications & GSP Update Package (memo text gives September 8, 2026). GSP page · Update package (PDF)
  19. RCW 35.22.620 (first-class cities), RCW 35A.40.200 (code cities), RCW 39.04.151 through 39.04.154 (small works roster), and the chapter 39.04 RCW dispositions table (RCW 39.04.155 repealed by 2023 c 395 § 37, effective July 1, 2024). 35.22.620 · 35A.40.200 · 39.04.152 · Dispositions