US bid bonds and bid guarantees: the FAR 28.101 20 percent floor and $3 million cap, the SF 24 form, alternatives to a surety, waivers and state rules.
Education only / verify at source / not legal advice. This guide explains bid bonds and other bid guarantees on US public works, using the Federal Acquisition Regulation (FAR), the US Code, the federal SF 24 bid bond form and state statutes. Global Guarantors publishes industry education. We aren't a surety, broker, insurer or law firm, and we don't publish premiums. The solicitation, the bond wording, the governing law and your own lawyer's advice control.
Start here: Surety 101: three parties, one written promise · Surety glossary · Contract surety guide
A bid bond is usually the first surety bond a construction company ever needs, and the one it files most often. Every time a contractor bids on public work that will need performance and payment bonds, the owner usually wants proof, at bid opening, that the bidder means its price and can deliver the final bonds. That proof is the bid guarantee, also called bid security, a bid deposit or, in Ohio's statute, a bid guaranty. Most contractors give it as a bid bond from a surety. Some give a certified check or a letter of credit instead.
The rules are more specific than many bidders expect. On federal work, the FAR sets a floor and a cap for the amount, lists the forms of security an agency must accept, and says exactly which bid guarantee defects get a bid rejected and which ones must be waived. States set their own rules, and they differ on the basic question of what the owner can collect when a low bidder walks away.
The FAR definition is the clearest statement of the job a bid guarantee does. A bid guarantee "means a form of security assuring that the bidder-" (1) "Will not withdraw a bid within the period specified for acceptance; and" (2) "Will execute a written contract and furnish required bonds, including any necessary coinsurance or reinsurance agreements, within the time specified in the bid, unless a longer time allowed, after receipt of the specified forms" (FAR 28.001).
So a bid bond isn't a performance or payment bond. It promises that the low bidder will sign and bond, and that the owner won't carry the cost if it doesn't. Once the final bonds are delivered, its job is done.

A bid bond also carries a signal. A surety that issues one has usually looked at the contractor's capacity and expects to write the final bonds if the bid wins, so the bid bond screens out bidders that couldn't get bonded before award, not after. Our guide to bonding capacity and how surety underwriting works explains what a surety looks at before it signs.
The penal sum or "penal amount" is "the amount of money specified in a bond (or a percentage of the bid price in a bid bond) as the maximum payment for which the surety is obligated" (FAR 28.001). It is a ceiling, not a fixed fine.
| Term | What it means on US public works | Where you see it |
|---|---|---|
| Bid guarantee | The FAR's umbrella term for any security given with a bid | FAR 28.001, 28.101, 52.228-1 |
| Bid bond | A bid guarantee given as a surety bond | SF 24 (federal); AIA A310 and owner forms (other work) |
| Bid guaranty | Ohio's statutory term; a bond, check, letter of credit or electronic verification | Ohio Rev. Code 153.54 |
| Annual bid bond | One bond covering a bidder's bids for a fiscal year; not for construction | FAR 28.001, SF 34 |
FAR 28.101-1 ties the bid guarantee to the final bonds. Paragraph (a) has two halves. A contracting officer "shall not require a bid guarantee unless a performance bond or a performance and payment bond is also required." And, subject to the waiver in paragraph (c), "bid guarantees shall be required whenever a performance bond or a performance and payment bond is required."
Construction needs a separate bid guarantee. "Only separate bid guarantees are acceptable in connection with construction contracts" (FAR 28.101-1(b)). Annual bid bonds, which cover a bidder's bids for a fiscal year, are for other than construction contracts (FAR 28.001).
Waivers are the agency's call. The chief of the contracting office may waive the requirement where a bid guarantee isn't in the government's best interest "(e.g., overseas construction, emergency acquisitions, sole-source contracts)" (FAR 28.101-1(c)).
The clause. FAR 28.101-2(a) has the contracting officer insert the provision at 52.228-1, Bid Guarantee, and allows changes such as a period other than 10 days for returning executed bonds.
A note on versions. Some agencies apply the FAR Council's Revolutionary FAR Overhaul (RFO) model deviation text for Part 28 under agency class deviations. The RFO text we checked keeps the same bid guarantee rules but says "must" where the FAR says "shall." Quotes here are from the codified FAR (FAC 2026-01, effective March 13, 2026).
FAR 28.101-2(b) sets the amount in four sentences:
"The contracting officer shall determine the amount of the bid guarantee for insertion in the provision at 52.228-1 (see 28.102-2(a)). The amount shall be adequate to protect the Government from loss should the successful bidder fail to execute further contractual documents and bonds as required. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated."
State and local owners set their own amounts. The state examples below run from 5 percent to the full amount of the bid.
FAR 28.106-1 makes Standard Form 24 the bid bond for federal work, "except in foreign countries." GSA's forms library lists SF 24 with a current revision date of 10/2023, and the form itself says "STANDARD FORM 24 (REV. 10/2023)" and "Previous Edition Is Not Usable." Our SF 24 bid bond field card links the official GSA PDF.
The obligation. The principal and sureties are "firmly bound to the United States of America (hereinafter called the Government) in the above penal sum." The condition is the heart of the bond:
"The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid."
So if the bidder signs and bonds, the bond is void. If it doesn't, the surety answers for the excess cost of procuring the work, up to the penal sum.
Extensions. SF 24 says "Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid." Beyond that, consider getting the surety's written agreement; the form does not state a procedure for longer extensions.
Other instructions. Corporate sureties "must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein" (Treasury Circular 570; FAR 28.202). Co-sureties may split limits "provided that the sum total of their liability equals 100% of the bond penal sum." The execution date can't be later than bid opening, and individual sureties attach an SF 28 affidavit.
Private and many state owners use the AIA A310 or their own forms instead, and the condition and damages measure can differ.
Bidders don't have to use a surety company. Provision 52.228-1(b) says the bidder "shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States."
FAR 28.204 covers the alternatives in more detail. "Any person required to furnish a bond to the Government may furnish any of the types of security listed in 28.204-1 through 28.204-3 instead of a corporate or individual surety for the bond" (FAR 28.204(a)).
| Form of security | FAR rule | Bid-stage points |
|---|---|---|
| Corporate surety bond (SF 24) | Surety must be on Treasury Circular 570 and within its underwriting limit (FAR 28.202) | The usual choice; doesn't tie up the bidder's cash |
| Individual surety | Pledged assets must meet Treasury eligibility rules; surety signs SF 24 and SF 28 (FAR 28.203-1) | Up to three individual sureties per bond; their combined pledged assets must cover the penal sum |
| US bonds or notes | Deposited at par value equal to the penal sum, with a power of attorney to collect or sell (FAR 28.204-1) | Ties up the securities until the guarantee is returned |
| Certified or cashier's check, bank draft, money order or currency | "in an amount equal to the penal sum of the bond," drawn to the agency (FAR 28.204-2) | Ties up cash |
| Irrevocable letter of credit (ILC) | Federally insured, investment-grade issuer; a separate ILC for each bond (FAR 28.204-3) | "If used as a bid guarantee, the ILC should expire no earlier than 60 days after the close of the bid acceptance period" |
Individual sureties. An individual surety is a person who pledges assets. If no individual surety supporting a bid guarantee is acceptable, "the offeror utilizing the individual surety shall be rejected as nonresponsible, except as provided in 28.101-4," and the finding "need not be referred to the Small Business Administration for a Certificate of Competency" (FAR 28.203-1(e)).
Return of the guarantee. The contracting officer returns bid guarantees "other than bid bonds" to unsuccessful bidders "as soon as practicable after the opening of bids," and to the winner on execution of the contract and bonds (52.228-1(b)). Bid bonds simply become void under their own condition.
Most corporate bid bonds are signed by an attorney-in-fact for the surety, not by a surety officer. FAR 28.101-3 sets out what the bidder must supply and how the contracting officer treats problems.
The FAR then splits problems into two kinds. The contracting officer must "Treat the failure to provide a signed and dated power of attorney at the time of bid opening as a matter of responsiveness" (28.101-3(d)(1)). A missing power of attorney is a defect in the bid itself. But questions about whether a power of attorney is authentic or enforceable are "a matter of responsibility" and are "handled after bid opening" (28.101-3(d)(2)).
If the surety confirms the power of attorney was valid, the officer "may require correction of any technical error." If the surety says it was invalid, "the contracting officer shall not allow the bidder to substitute a replacement power of attorney or a replacement surety" (28.101-3(e)). Our public owner's guide to accepting and verifying bonds walks through those checks, including Treasury Circular 570.

FAR 28.101-4 is short but decisive. "In sealed bidding, noncompliance with a solicitation requirement for a bid guarantee requires rejection of the bid, except in the situations described in paragraph (c) of this subsection when the noncompliance shall be waived" (28.101-4(a)). FAR 14.404-2(j) says the same from the sealed bidding side. The bid guarantee is a responsiveness item, so a bidder usually can't fix a missing or deficient guarantee after bids are opened.
Negotiated procurements are softer. Noncompliance "requires rejection of an initial proposal as unacceptable" only if the agency awards on initial proposals without discussions. Otherwise, bid guarantee deficiencies for offerors in the competitive range "shall be addressed during discussions and the offeror shall be given an opportunity to correct the deficiency" (28.101-4(b)).
Eight mandatory waivers. Noncompliance "shall be waived" in these cases, "unless the contracting officer determines in writing that acceptance of the bid would be detrimental to the Government's interest" (28.101-4(c)):
Waiver 2 shows the logic of the system: a bid guarantee covers the gap between the low bid and the next acceptable one, so a short guarantee that still covers the gap is waived. In sealed bidding, other noncompliance generally requires rejection unless another FAR waiver applies; negotiated procurements follow paragraph (b).
Public bid security rules use three different measures for what the owner can recover.
| Measure | How it works | Example source |
|---|---|---|
| Difference in price (excess cost), capped at the penal sum | The owner recovers what it costs to get the work done above the defaulting bid, up to the guarantee amount | SF 24 condition (b); FAR 52.228-1(e) |
| Lesser of the price difference and a penalty | The owner recovers the gap to the next bidder or a percentage penalty, whichever is less | Ohio Rev. Code 153.54(B)(1), (C)(1) |
| Forfeiture or liquidated damages | The whole deposit, or the amount stated in the bond, goes to the owner | RCW 36.32.235(7); RCW 54.04.080 |
Federal. Provision 52.228-1(d) and (e) give the contracting officer a contract remedy as well as the bond. If the successful bidder "fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default." Then "the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference." The SF 24 condition says the same from the surety's side: the bond is void if the principal "pays the Government for any cost of procuring the work which exceeds the amount of the bid."
Under the federal model, the penal sum is a ceiling, not the claim.
Forfeiture models. Some state statutes keep the whole deposit, whatever the price gap. Under Washington's statute for counties of 400,000 or more with a purchasing department, if the bidder fails to sign and give the contractor's bond "within 10 days after notice of the award, exclusive of the day of notice, the amount of the bid deposit shall be forfeited to the county and the contract awarded to the next lowest and best bidder" (RCW 36.32.235(7)). Washington public utility districts take a bid bond "conditioned that the bidder will pay the district as liquidated damages the amount specified in the bond" unless the bidder signs and furnishes the performance bond within ten days (RCW 54.04.080).
Under a forfeiture rule, a walk-away can cost the full deposit even when the next bid is close, which matters to the surety and its indemnitors.
The most common reason a low bidder won't sign is a mistake in its price. For federal sealed bidding, "After the opening of bids, contracting officers shall examine all bids for mistakes" (FAR 14.407-1). Under FAR 14.407-3, the agency may correct a bid where "clear and convincing evidence establishes both the existence of the mistake and the bid actually intended," permit withdrawal where the evidence is weaker, or allow neither. If a correction leaves the guarantee too small, FAR 28.101-4(c)(5) waives that only if the bidder raises it. Mistakes found after award go through FAR 14.407-4.
The FAR doesn't say what happens to the bid bond when withdrawal is permitted; ask counsel and the surety. Some states add their own consequence. In Washington, "A low bidder who claims error and fails to enter into a contract is prohibited from bidding on the same project if a second or subsequent call for bids is made for the project" (RCW 54.04.080).
A bid bond only makes sense because of the bonds that come after it. On federal construction, those are set by the Bonds statute in 40 U.S.C. chapter 31, subchapter III, which the FAR notes was "formerly known as the Miller Act."
Thresholds. FAR 28.102-1(a) says the statute "requires performance and payment bonds for any construction contract exceeding $150,000." For "construction contracts greater than $35,000, but not greater than $150,000," the contracting officer must pick two or more payment protections, such as a payment bond, an irrevocable letter of credit, a tripartite escrow agreement or certificates of deposit (FAR 28.102-1(b)(1)).
The statute itself still reads "Before any contract of more than $100,000 is awarded" (40 U.S.C. § 3131(b)). The FAR applies a higher threshold that was already established by regulation when 41 U.S.C. § 1908(b)(2)(D) was enacted. That provision preserves the earlier regulatory modification while excluding these thresholds from further escalation under § 1908; FAR 1.109(c) says the statute "does not permit escalation" of them. The statute text and the operative FAR threshold are different for that reason.
Amounts. For contracts over $150,000, unless the contracting officer decides a lower amount is enough, the performance bond must equal "100 percent of the original contract price," plus 100 percent of any increase. The payment bond is also 100 percent, and "must be no less than the amount of the performance bond" (FAR 28.102-2(b)).
Bonds come "before receiving a notice to proceed with the work or being allowed to start work" (FAR 28.102-1(c)). In short, a federal bid guarantee promises that a 20 percent bid bond will become 100 percent performance and payment bonds on time. Our Miller Act and little Miller Act guide covers the payment bond side, including the claim notice and suit deadlines.
Each state sets its own rules, often several for different owners. These three show the range; they aren't a national rule.
| State, owner and source | Amount and forms allowed | If the bidder fails to sign or bond |
|---|---|---|
| Washington: counties of 400,000+ with a purchasing department (RCW 36.32.235(5), (7)) | "five percent of the amount of the bid proposed"; surety bond, postal money order, cash, cashier's check or certified check | Deposit forfeited after 10 days from notice of award |
| Washington: public utility districts (RCW 54.04.080) | Not less than 5 percent of the bid; certified or cashier's check, or bid bond with a surety licensed in the state | Liquidated damages in the bond amount; check forfeited |
| Texas: counties (Tex. Local Gov't Code §§ 262.032(a), 262.027(g)) | Bid specifications "may require" a bid bond of "five percent of the total contract price"; surety company authorized in Texas | County may award to the next bidder in order |
| Ohio: state and local public improvements (not ODOT) (Ohio Rev. Code 153.54) | Bond for the full amount of the bid, or a check or letter of credit for 10 percent; bond, certified or cashier's check, letter of credit, or electronic verification | The lesser of the price difference and a 10 percent penal sum |
Washington. "No bid may be considered for public work unless it is accompanied by a bid deposit in the form of a surety bond, postal money order, cash, cashier's check, or certified check in an amount equal to five percent of the amount of the bid proposed" (RCW 36.32.235(5)). The final bond comes from RCW 39.08.010.
Texas. The county rule is permissive: bid specifications "may require the bidder to furnish a good and sufficient bid bond in the amount of five percent of the total contract price," and "A bid bond must be executed with a surety company authorized to do business in this state" (Tex. Local Gov't Code § 262.032(a)). After award, Government Code § 2253.021 requires a performance bond over $100,000 and a payment bond over $25,000 ($50,000 for a municipality), and an owner "may not require a contractor for any public building or other construction contract to obtain a surety bond from any specific insurance or surety company, agent, or broker" (§ 2253.021(g)).
Ohio. A bond-form guaranty is "for the full amount of the bid," while a check or letter of credit "shall be equal to ten per cent of the bid" (Ohio Rev. Code 153.54(A)). The bond-form guaranty must also be conditioned to "Indemnify" the owner against failure to perform and to pay subcontractors, suppliers and laborers (153.54(B)(2)). That statutory condition adds performance and payment protection to the bid-stage promises. On a walk-away, liability is "for the difference between the bid and that of the next lowest bidder, or for a penal sum not to exceed ten per cent of the amount of the bond, whichever is less" (153.54(B)(1)). On improvements under half a million dollars, a bidder may withdraw if "the surety certifies in good faith that the bidder is unable to perform the subsequent contract because to do so would exceed the bidder's bonding capacity" (153.54(G)).

On federal work, a surety letter can't replace a required bid guarantee; it isn't one of the accepted forms. The FAR uses consent of surety for something that happens after award: "an acknowledgment by a surety that its bond given in connection with a contract continues to apply to the contract as modified" (FAR 28.001). The federal form for that is SF 1415, Consent of Surety and Increase of Penalty (FAR 28.106-1(l)).
In practice, the same words often describe a tender-stage letter in which the surety says it is prepared to write the final bonds. Such letters help owners gauge a bidder; whether they create claimable security depends on their wording, and they should not be assumed to carry a penal sum.
| Document | Stage and promise | Can the owner claim on it? |
|---|---|---|
| Bid bond (e.g., SF 24, AIA A310) | With the bid; bidder will sign and bond, or pay the stated measure | Yes, up to the penal sum |
| Surety letter or tender-stage "consent of surety" | With the bid or at prequalification; surety's stated willingness to write final bonds | Depends on the wording; often not |
| Consent of surety (FAR 28.001; SF 1415) | After award, on a modification; existing bond continues to apply to the modified contract | It extends the existing bond |
Electronic delivery doesn't change the wording or the need to confirm the bond is real. Our e-bonding explainer covers how electronic execution and delivery work, and the verification guide in Related reading covers how owners confirm a bond with the surety.
Canada contrast. Canadian public tenders do the same job with different defaults. The common forms are the CCDC 220 bid bond and, for federal tenders, the PWGSC-TPSGC 504 bid bond. Tenders often also ask for a surety's agreement to bond. Canadian tendering law treats a compliant bid as forming "Contract A" with the owner (Ron Engineering, M.J.B. Enterprises), which shapes withdrawal and forfeiture; US federal work runs on the FAR's responsiveness, waiver and mistake rules instead. Our guide to bid bonds in Canada and CCDC 220 tendering covers the Canadian forms, amounts and cases.
General education, not legal advice. Use it as a list of questions for the solicitation, your surety professional and your lawyer.
Before you request the bid bond
When you assemble the bid
After bid opening
What is a bid bond? A bid bond is a surety bond given with a bid on a construction contract. It assures the owner that the bidder won't withdraw its bid during the acceptance period and will sign the contract and furnish the required performance and payment bonds. If the bidder doesn't, the surety pays the owner's loss up to the bond's penal sum.
How much is a bid bond on federal construction? At least 20 percent of the bid price, capped at $3 million (FAR 28.101-2(b)). The solicitation sets the figures.
Can I use a check or letter of credit instead of a bid bond? On federal work, yes: 52.228-1 accepts money orders, certified or cashier's checks, irrevocable letters of credit and certain US bonds or notes. State rules differ.
What happens if the low bidder won't sign the contract? On federal work, the bidder is liable for the cost of acquiring the work above its bid, and the bid guarantee is available to offset that difference. Some states forfeit the whole deposit instead, and Ohio uses the lesser of the price difference and a 10 percent penal sum.
Will a missing bid bond get my bid rejected? In federal sealed bidding, usually yes, except in the eight waiver cases in FAR 28.101-4(c).
Is a consent of surety the same as a bid bond? No. In the FAR it's a post-award acknowledgment that a bond covers a modified contract. A tender-stage surety letter usually isn't claimable security.
Retrieved November 4, 2026; selected sources re-checked November 5, 2026 (PT).