On FHWA-funded building projects, WSDOT uses DOT Form 272-003B, one contract bond covering performance, payment of workers and suppliers, and state taxes. It also covers defects found within one year of final acceptance, up to 10% of the penal sum. Under RCW 39.08, the penal sum is the full contract price.
| Title / common name | Contract Bond: Building Construction, FHWA Funded Project (WSDOT DOT Form 272-003B), the Washington State Department of Transportation contract bond for federally funded building construction contracts WSDOT bonds non-FHWA building work on DOT Form 272-003 and highway work on DOT Form 272-002B. This card covers the FHWA-funded building form only. |
|---|---|
| Bond type | Contract: combined performance and payment bond, with a one-year defect indemnity |
| Industry / license category | Construction / contract surety |
| Jurisdiction | United States → Washington → Washington State Department of Transportation (WSDOT) → public works contractor’s bond, chapter 39.08 RCW RCW 39.08.010 requires a public body contracting for work to take a surety bond conditioned on faithful performance and on payment of laborers, mechanics, subcontractors, material suppliers and suppliers of provisions. The form title marks it for FHWA-funded projects. |
| Obligee | State of Washington The bond reads “jointly and severally held and bound unto the State of Washington”. The second page has WSDOT’s approval block for the Secretary of Transportation, with the Surety Bond No. and the WSDOT Contract No. |
| Typical penal sum | The full contract price The form leaves the dollar amount blank. RCW 39.08.030(1)(a) says the bond “must be in an amount equal to the full contract price agreed to be paid for such work or improvement”. Confirm the amount in the contract documents. |
| Who needs it | Contractors awarded a WSDOT building construction contract on an FHWA-funded project The executed contract is attached to the bond and incorporated by reference. The principal and the surety’s attorney-in-fact sign it, and the form has a space for the name and address of the agent’s local office. |
| What it covers | Performance until acceptance, payment of labor and suppliers, state taxes, and defects found within one year of final acceptance The condition covers all approved change orders “as if they were in the original contract”. It covers payment of all laborers, mechanics, subcontractors, material men and anyone supplying provisions and supplies, and payment of taxes under Titles 50, 51 and 82 RCW. It also indemnifies the State for defects in workmanship or materials that “develop or be discovered within one year after the final acceptance”. |
| Defect liability cap | Defect liability for the first year capped at 10% of the penal sum The form says liability for defects “for a period of one year after the acceptance of the work shall not exceed the sum of ten percent (10%)” of the penal sum. On the non-FHWA 272-003 building form, the defect indemnity runs six years. |
| Claims on the bond | Labor, subcontractor and supplier claimants file a written notice of claim within 30 days after the contract is completed and the work accepted Under RCW 39.08.030, claimants other than the state (for taxes) have no right of action on the bond unless they file that notice with the public body in time. See the statute for the notice wording and the rules on suits. |
| Form number / edition | DOT Form 272-003B EF · 08/2011 · 2 pages The revision date is printed on both pages of the official PDF and matches the date in WSDOT’s electronic forms index (checked 2026-11-09). |
| Effective / cancellation | From execution through acceptance and payment, with the defect indemnity running one year after final acceptance The form has no surety cancellation clause. The obligation is “void” only once the principal has performed, paid and met the defect condition; until then it stays “in full force and effect”. |
| Source | WSDOT DOT Form 272-003B: Contract Bond, Building Construction, FHWA Funded Project (PDF) (official state form · 08/2011 · 2 pages · linked, not hosted) Also: WSDOT electronic forms · RCW 39.08.010 · RCW 39.08.030 |
| Status | current |
| Last verified | 2026-11-09 |
From DOT Form 272-003B: “provided the liability hereunder for defects in materials or workmanship for a period of one year after the acceptance of the work shall not exceed the sum of ten percent (10%) of the amount hereinabove set forth as the penal sum of this Bond.”
All three WSDOT contract bonds run to the State of Washington for the full contract price and combine performance and payment in one instrument. The FHWA building form adds the Title 50, 51 and 82 RCW tax condition and a one-year defect tail. The state 272-003 building form has a six-year defect tail instead. The 272-002B highway contract bond carries the tax condition. Bids are secured with the WSDOT 272-001 proposal bond.
FHWA funding doesn’t turn this into a Miller Act bond: the obligee is still the State, and claims follow RCW 39.08. Our Miller Act and little Miller Act guide explains that split. The subcontractor payment bond claim guide covers the 30-day notice, and the maintenance and warranty bonds guide explains post-completion defect cover.
Open the Source link above for the official WSDOT PDF. We summarize the field facts and quote one short key clause rather than reproducing the form. Use the current form from WSDOT when filing. Global Guarantors doesn’t host copies.